Goals & Needs

Our client is a manufacturer of high-performance tires.
During the manufacturing process, new tires must go through an internal wash before an absorbing acoustic foam is applied on them.
As these tires are in production 24 hours a day, 6 days a week, water consumption is significant! The washing system consumes 500 liters of water per hour which represents 72 000 liters of water per week!
It was therefore essential for our customer to use a treatment and wastewater recycling station which would be connected to this system.
The clear water of the treatment would be returned in the system and reused.